Illuminated fiber optic cables
Data Center Fiber Specialists

Precision fiber
for the racks that
can't go dark.

Buckner Integration installs, terminates, and certifies fiber cabling inside live data centers. Licensed. Insured. BICSI-trained.

LINK ACTIVEOS2 · OM4 · MPO-24
Licensed Low-Voltage Contractor
BICSI-Trained Technicians
Fully Insured & Bonded
OSHA-10 / OSHA-30 Certified
20+
Years in low voltage
Licensed
Low-voltage contractor
99.999%
Uptime preserved
24 / 7
Emergency response
/ Capabilities

Every strand accounted for.

We do one thing exceptionally well: physical layer fiber inside data centers. From single cross-connects to full cage buildouts — designed, installed, and certified by the same crew.

01

Single-mode & Multi-mode Fiber

OS2, OM3, OM4, and OM5 pulls sized for today's density and tomorrow's bandwidth. Every run labeled, tested, and documented.

02

Fusion Splicing & Termination

LC, SC, MPO/MTP field terminations by BICSI-trained technicians. Sub-0.3 dB splice loss, verified with OTDR.

03

Structured Cable Management

Overhead trays, under-floor runs, and rack-to-rack pathways engineered for airflow, service loops, and future MACs.

04

Tier III & IV Facility Work

Concurrently maintainable installs in live data halls. Change windows honored. Zero interruption to production traffic.

05

Testing & Certification

Tier 1 & Tier 2 certification with full OTDR traces, insertion loss, and polarity reports delivered on completion.

06

MACs & Refresh Projects

Rip-and-replace, cage buildouts, capacity expansions, and migration cutovers — planned to the minute.

Fiber technician terminating a connector
Ref · TERM-014OS2 / LC-UPC
/ Craft

Terminated by hand.
Tested by instrument.

Our technicians treat every connector like a fingerprint. Cleave, splice, inspect, and certify — the same discipline whether it's two strands or two thousand. The traces come back clean because the work was clean.

  • Sub-0.3 dBaverage splice loss
  • End-face inspectionon every connector
  • Tier 1 + Tier 2certification standard
  • Full documentationdelivered digitally
/ Process

Four phases. No surprises.

01

Site walk

We walk the floor, map pathways, and audit existing infrastructure.

02

Design & BOM

Signed drawings, bill of materials, and a change-window schedule.

03

Install

Uniformed, badged technicians. Cleanroom discipline. Zero shortcuts.

04

Certify

Full test results, as-built drawings, and warranty documentation.

/ Get in touch

Ready when the change window opens.

Tell us about the facility, the scope, and the timeline. We'll come back with a walk-through date and a firm proposal.

Start a project